SUPER DRILLING PVT LTD

                     An ISO 9001:2000 certified company  



                                                    

Super Drilling Pvt. Ltd.
F-90/19,
Okhla Industrial Area Phase-1,
New Delhi, New Delhi 110020
India

ph: +91-11-46501650
alt: +91-9810164103

sales@superdrilling.com

Follow us on :Facebook

  • Home
  • About UsClick to open the About Us menu
    • About Our Company
    • Mission & Vision
  • ServicesClick to open the Services menu
    • Horizontal Directional Drilling (HDD)
    • Pipe Bursting
    • Pipe Ramming
    • Pipe Jacking
    • Pneumatic Moiling
    • Micro Tunneling
    • Diamond Drilling
    • Concrete Core Drilling
    • Anchorage
    • Destructive Rock Drilling
    • Grouting
    • Piling
    • Dewatering
    • Water Well/Tube Well
    • Recharge Well
  • SectorsClick to open the Sectors menu
    • Telecom
    • Oil & Gas
    • Sewarage / Water Line
    • Electrical
    • Hydel / Dam Sector
    • Metro / Railways
  • ProductsClick to open the Products menu
    • HDD Machines
    • Tracking Systems
    • Pipe & Cable Locator
    • Drill Rods & Tools
  • Quality Policy
  • OHS&E Policy
  • Contact Us

Piling

 

 

King Post

 

King Post is a vertical supporting post which is mainly used for the preparation of site for the underground construction. King Post is also used in the construction of roof for the surface while underground construction is continued under the surface.

 

 

 

Toe Pin


 

Toe Pin a vertical support of shuttering of the soil to strength the shuttering in order to prevent the soil displacement during deep excavation while construction work continues. This is very useful is the construction of bridge and underground civil construction; where deep excavation is to be carried out.

 

 

 

Mini Pile/ Micro Pile


 

Micro Pile, also known as Mini Pile, is used for strengthening and stabilizing the foundation of existing constructions. This is mostly used in civil projects like bridge, tower etc. Micro Piles are normally of diameters of 100 to 400 mm and are also used for slope stabilization.

 

 

 

Shear Pin


 

We carried out installation of Shear Pin for prevention of damage from overload or load displacement.

 

 

 

 

Soldier Piles

 

Soldier piles are constructed of H- Beam about 2 to 3 m apart. It is installed prior to excavation. As the excavation proceeds, horizontal timber lagging is inserted behind the H- Beam flanges. The horizontal earth pressures are concentrated on the Soldier Piles because of their relative rigidity compared to the lagging. Soil movement is minimized by maintaining the lagging in firm contact with the soil.

 

 

Copyright 2012@Super Drilling Pvt Ltd

Super Drilling Pvt. Ltd.
F-90/19,
Okhla Industrial Area Phase-1,
New Delhi, New Delhi 110020
India

ph: +91-11-46501650
alt: +91-9810164103

sales@superdrilling.com

Follow us on :Facebook